LASO has recently started the special transport of wind components BARÃO DE S. JOÃO wind park in Algarve, Portugal.
The project requires the transport of multiple components: the tower sections originate from GRI Renewable Industries’ facilities in Carballiño, Spain; and the blades, nacelles, power trains and hubs are being transported from the port of Aveiro.
For transportation of the blades, which measure up to 82 m long,(the biggest in Iberian Peninsula) Laso is utilising its Goldhofer FTV 850 trailer.
Laso’s Nooteboom Mega Windmill Transporter (MWT) with the lift adapter (Liftad) 100 is also being deployed for the project, handling the larger tower sections and the nacelles.